 |
 |
| The Old expansion Joint before it was ripped out.
|
Multiple tar and pitch layers on the old joint.
|
 |
 |
| Overhead of Emergency Radio Room with leaky expansion joint visible.
|
Close up of the old joint from inside the Emergency Radio room.
|
 |
 |
| Removing the rubber of the old expansion joint on the 01 level.
|
Joint rail waiting to be scraped and brushed.
|
 |
 |
| Looking at STBD joint rail from inside Emergency Radio.
|
Bryan scrapping rubber and glue off joint rails
|
 |
 |
| Ed Zajkowski caulking the new joint.
|
New Expansion Joint viewed from inside Emergency Radio.
|
 |
 |
| New Expansion Joint viewed from the Port side.
|
New Expansion Joint viewed from the 01 level.
|